top of page
  • Satellite Evolution Group

MIURA 1 launch postponed


The MIURA 1 SN1 Test Flight mission of PLD Space scheduled this morning at the INTA facilities in El Arenosillo (Huelva), is postponed due to weather conditions.

The last wind measurement balloon launched shows wind gusts of more than 30 metres per second, exceeding the established limit.

Both the launch pad and the rocket are in perfect condition and the team faces the next days with determination.

A new launch date will be announced soon.

bottom of page